1 Year 2013
1.1 April 2012 – October 2013 PAMIR ENERGY COMPANY JSC
Address: Gulmamadova str., 75,
Designing, manufacture and supply of five sets of 1000mm butterfly valves for Khorog HPP (Republic of Tajikistan) in disassembled state with a single spare tools and accessories kit per five sets as well as rendering services on installation supervision and commissioning.
1.2 August 2013 – October 2013 ANDTITZ HYDRO LTD.
Address: 109147, Bolshaya Andonevskaya Str., 23,
Moscow, Russian Federation
Designing, manufacture and supply of auxiliary equipment for hydraulic turbines No. 1 and No. 2 of Iovskaya HPP-10 of the cascade of Nivskiye HPPs, Kolsky branch of TGC-1 JSC.
1.3 February 2013 – June 2013 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Rendering engineering consulting services on dismantling of a unique Ø4200mm spherical valve at Nurek HPP (unit No. 8), Republic of Tajikistan, weighing 700 tons, with a view to its subsequent overhaul.
2 Year 2014
2.1 January 2014 – April 2014 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Designing, manufacture and supply of parts, assembly units and fasteners for mounting a unique Ø4200mm spherical valve for hydraulic unit No.8 of Nurek HPP (Republic of Tajikistan).
2.2 November 2013 – May 2014 Rendering engineering consulting services and technical supervision services (installation supervision) when installing a unique Ø4200mm spherical valve at Nurek HPP (unit No. 8), Republic of Tajikistan, weighing 700 tons, after its dismantling and overhaul of its parts and assembly units.
2.3 June 2014 – December 2014 UZBEKENERGO JSC
Address: 100000, Istiqlol Str., 6,
Tashkent city, Republic of Uzbekistan
Development of a detailed design for manufacture of 5000mm butterfly valve for Charvakskaya HPP (Republic of Uzbekistan).
3 Year 2015
3.1 November 2014 – January 2016 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Designing, manufacture and supply of four sets of spare parts for modernization of butterfly valves installed at Baipazinskaya HPP (Republic of Tajikistan).
3.2 June 2014 – January 2015 PAMIR ENERGY COMPANY JSC
Address: Gulmamadova str., 75,
Khorog, GBAO, Republic of Tajikistan
Designing, manufacture and supply of five sets of hatches to be installed on penstocks downstream the Ø1000mm spherical valves at Khorog HPP (Republic of Tajikistan).

Designing, manufacture and supply of four sets of control systems for Ø1600mm butterfly valves Nos. 1, 2, 3 and 4 for Pamir-1 HPP (Republic of Tajikistan) in disassembled state with a single set of spare parts per four sets of control systems for butterfly valves as well as rendering services on their installation supervision and commissioning.
3.3 January 2015 – March 2015 YUZHENERGOBUD PJSC
Address: 55000, Industrial park, Yuzhoukrainsk,
Mykolaiv region, Ukraine
Designing, manufacture and supply of parts for modernization of a wicket gate for hydraulic unit No.3 of Tashlykskaya pumped-storage plant (Ukraine).
4 Year 2016
4.1 April 2016 – August 2016 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Designing, manufacture and supply of rings to replace the seal of a hydroturbine of Nurek HPP (Republic of Tajikistan).
4.2 September 2016 – December 2016 Execution of a workpackage on dismantling parts of the service and maintenance seals and the bypass hydraulic valve and on mounting new parts of the service and maintenance seals and the bypass hydraulic valve with a new hydraulic drive on four Ø7600mm butterfly valves at Baipazinskaya HPP (Republic of Tajikistan).
4.3 June 2016 – March 2017 Designing, manufacture and supply of spare parts, accessories and tools to overhaul the Ø4200mm spherical valve for hydraulic unit No.9 of Nurek HPP (Republic of Tajikistan).
5 Years 2017-2018
5.1 May 2017 – August 2017 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Designing, manufacture and supply of the generator shaft for Tsentralnaya HPP (Republic of Tajikistan).
5.2 October 2017 – January 2018 Designing, manufacture and supply of spare parts for hydraulic unit No.9 of Nurek HPP (Republic of Tajikistan).
5.3 June 2017 – May 2018 Rendering engineering consulting services and technical supervision services (installation supervision) when installing a unique Ø4200mm spherical valve at Nurek HPP (unit No. 9), Republic of Tajikistan, weighing 700 tons, after its dismantling and overhaul of its parts and assembly units.
6 Year 2019
6.1 January 2019 – February 2019 OSHC “Barki Tojik”
Address: 734026, Ismoili Somoni avenue, 64
Dushanbe, Republic of Tajikistan
Rendering engineering consulting services and technical supervision services (installation supervision) when installing the generator shaft for Tsentralnaya HPP (Republic of Tajikistan),